bathroom lighting, step 2
07/13/09
Well it turns out that this is a 3-day project, not 2. I am not more or less exhausted than yesterday, but I do have to go to work tomorrow which makes me feeeeeel more tired today. I did not get nearly as much done as I would have liked, which has a lot to do with oversleeping this morning an not getting up until 12 this morning. That is so unlike me, I am normally up by 9:30 for sure on the weekends. Yesterday must have really worn me out. Again, manual labor is bad and not for me at all.
- Coffee
- More Coffee and a breakfast burrito
- Trip # 1 to Home Depot
- Trip 1.5 to Home Depot b/c I realized after settling into the parking lot that I had forgotten my wallet.
- Wander the aisles at Home Depot for 45 minutes
- Draw and cut holes in the wall
- Ask Ryan to drill holes in the joists for me
- String wires through holes Ryan just drilled
- Hook up the lights
- Test lights
- Dance around the kitchen
- Spackle miscellaneous holes and wait for Ryan to get back from Home Depot trip #3
- Push in can lights and add lights
- start drinking heavily and making dinner
Ok it is definitely bed time now, the wine and Advil are kicking in.










